100 tie-ins across Jurong Lube (35 & 39 Shipyard Road) and Jurong Refinery (18 Pioneer Road).
Piping · structural & platform work · procurement · E&I · insulation · CCPW · civil works
Installation of a -30t glass-lined tank using atandem lift.
• Structural platform piping • Shutdown tie-in • Blasting & painting • NOE
1 km of 8″ firewater piping plus fire fighting accessories in a new storage area.
Fast-track two-month completion • blasting,painting 8 wrapping • NOE
1.5 km of 8″ piping installed on pipe rack.
Scaffolding • BCA structural • pump alignment blasting 8 painting • civil works
16″ piping replacement in the tank farm.
BCA structural • blasting 8 painting • NDE • civil works • hot tap
Fast-track 2 km inter-unit 16″ MHP pipe rack steam line.
Scaffolding BCA structural hot tap operations • civil works
Piping works with 30t skid installation.
Blasting 8 painting • scaffolding • civil work
Full piping demolition and construction across the lube storage area.
Structural • scaffolding • hot tapping • cold cut plug & weld • pump alignment
Partner with Penguin Engineering & Construction for your next project.